Located in the Dilworth area of Charlotte, NC; The Pearl is a 26-acre, $1.5 billion medical innovation district that will be Charlotte’s first four-year medical school. It is a joint project between Atrium Health of Charlotte, Wake Forest Baptist Health, and Wake Forest University to create the second Wake Forest School of Medicine campus.
ASC Equipment provided wind restraint engineering and vibration isolation solutions for Mechanical systems and equipment. Additionally, we provided structural support design for various ceiling hung medical booms and equipment.
Project
The Pearl Innovation District
Charlotte, NC
What We Did
ASC Equipment Provided:
- Provided wind restraint engineering for Mechanical equipment, duct and pipe
- Designed and provided spring isolated structural steel frames for cooling towers, chillers, and condensing units
- Provided vibration isolation solutions for Mechanical equipment and piping
- Designed and provided spring isolated floating skids to support multiple pumps and equipment
- Provided structural support design for ceiling hung medical equipment
Wind Restraint Engineering
Provided wind restraint engineering for Mechanical Equipment, Duct, and Pipe.
Vibration Isolation
Provided vibration isolation solutions for Mechanical Equipment and Piping.
Steel Frame Design
Steel frame design and vibration isolation for roof-mounted cooling towers and chillers.
Structural Support Design
Structural support design for Ceiling Hung Medical Equipment.